The hydraulic lubrication system of single-cylinder cone crusher adopts the integrated design of hydraulic oil circuit and lubricating oil circuit, and at the same time, a set of oil return filters will be set up, and a filter screen will be set on the oil return circuit for easy inspection and maintenance. The air cooler is installed independently and equipped with a bypass valve to facilitate the smooth passage of oil in winter.
This product is applicable to the host type:
(CH 420/430/CH 440/660/870/890/895/GP 200/220/300/330/500/550 and S type)
Assurance
All crusher parts supplied are engineered to exactly meet the original specifications and are guaranteed to fit crushers that have not undergone rebuilds or repairs with modifications or deviations from the original dimensions.
Delivery Time
Wearing parts with existing casting molds will typically be delivered within 4-6 weeks, depending on the order quantity. Wearing parts without an existing casting mold will typically be delivered within 6-8 weeks. The delivery time of spare parts such as bronze parts, machined parts, fastener kits, and hydraulic parts shall be determined by our inventory, please contact us for details.
The hydraulic lubrication system of single-cylinder cone crusher adopts the integrated design of hydraulic oil circuit and lubricating oil circuit, and at the same time, a set of oil return filters will be set up, and a filter screen will be set on the oil return circuit for easy inspection and maintenance. The air cooler is installed independently and equipped with a bypass valve to facilitate the smooth passage of oil in winter.
This product is applicable to the host type:
(CH 420/430/CH 440/660/870/890/895/GP 200/220/300/330/500/550 and S type)
Assurance
All crusher parts supplied are engineered to exactly meet the original specifications and are guaranteed to fit crushers that have not undergone rebuilds or repairs with modifications or deviations from the original dimensions.
Delivery Time
Wearing parts with existing casting molds will typically be delivered within 4-6 weeks, depending on the order quantity. Wearing parts without an existing casting mold will typically be delivered within 6-8 weeks. The delivery time of spare parts such as bronze parts, machined parts, fastener kits, and hydraulic parts shall be determined by our inventory, please contact us for details.
| B1-908 Yanjing Headquarters Base, Yanjiao Town, Sanhe City, Langfang City, Hebei Province. |
| +86-186 0029 5145 +86-108 0886 867 |
|